September 28, 2006: These front doors are almost ready for opening Sunday! |

September 28, 2006: Many final details are being nailed into place. |

April 27, 2006: Board-and-batten siding and side doors in place. |

April 27, 2006: Board-and-batten siding and front doors in place. |

March 9, 2006: Steeple was placed this morning! |

March 4, 2006: Cupola stands ready for elevation. |

January 6, 2006: Roof and windows are installed. |

January 6, 2006: Roofing work inside. |

November 30, 2005: Pastor's study, above the narthex. |

November 30, 2005: A bird's eye view of the fellowship hall. |

September 30, 2005: Fellowship hall roof and narthex taking shape. |

September 30, 2005: Fellowship hall roof as seen from the rear of the building. |

September 2, 2005: Framing the fellowship hall floor on the newly constructed foundation walls. |

September 2, 2005: Framing the narthex floor. |

July 2, 2005: Digging the foundation for the narthex. |

July 2, 2005: Digging the foundation for the narthex, second view. |

April 20, 2005: Removing the brick facade. |

April 20, 2005: Bricks and cinderblocks waiting for the dumpster. |

April 8, 2005: Lake Waller |

March 23, 2005: Erosion control and grading. |

March 23, 2005: Erosion control and grading. |

March 23, 2005: Erosion control and grading. |

March 5, 2005: Brick rancher single-family home as seen from Route 216. |

March 5, 2005: Brick rancher single-family home as seen from the back yard. |

March 5, 2005: Inside of the brick rancher, where the building commitee met. |

Architect's drawing of our new church home |